SRI GCS Literature Detailed ex SRI website 2014 - page 542

EPAMethod 16BGC configuration
November 2013
As the tubing exits the reactor it will
extend about 1 foot and then loop
back to connect to the bulkhead fitting
and column. This is hard to show in
the photo because the tubing is so
thin its hard to see.
Connect theFS tubing to the bulk-
head fitting using the capillary adapt-
er which aligns theFS and the col-
umn forminimum dead volume.
Tighten the graphite ferrules on both
sides of the bulkhead fitting securely.
1...,532,533,534,535,536,537,538,539,540,541 543,544,545,546,547,548,549,550,551,552,...870
Powered by FlippingBook