MRC-2014Hot.svg - page 128

Installation
20 of 82
Figure 6 Glovebox Config Screen
2
Press the
Numeric blue display
button next to Working Maximum SP. A numerical input
screen appears
. Type in
12.0
and press the
Enter
key.
3
Press the
Numeric blue display
button next to Working Minimum SP. A numerical input
screen appears. Type in
10.0
and Press the
Enter
key.
Figure 7 Numerical input screen
4
You will hear working gas enter the box automatically, and the pressure indicators will read
11mbar.
a
Ensure that the inside and outside doors to the Antechambers are closed.
b
Turn on the vacuum pump by pressing the
Start
button on the main screen.
c
Open the evacuate valve on the Large Antechamber and allow the Antechamber to
evacuate to -30.
d
Close the evacuate valve.
e
Repeat this process for the mini Antechamber.
5
Wait 10 minutes to allow the Glovebox to stabilize.
105
1...,118,119,120,121,122,123,124,125,126,127 129,130,131,132,133,134,135,136,137,138,...
Powered by FlippingBook