3.7.1 Switching Power On
The main power ON/OFF switch is accessible from the left side of the gas purifier module on
the side wall of the PLC enclosure.
Switch the power on. The main power switch light ups. All box electrical equipment is enabled
with this switch. There is no other action necessary to turn power on with the possible exception
of optional equipment.
The fluorescent light in the hood is controlled by its own manual switch located on the top of
the light hood.
3.7.2 Pressure Testing the System
The Glovebox system is a leak-tight, hermetically sealed system. The entire system has been
pressure and performance-tested prior to shipment. After assembly, the system must be pressure
tested to ensure that all of the fittings and pipework have been connected properly.
After initial power on, the Glovebox Control screen shows the following display
. In
order to change any setting, the user must log in to the system.
Figure 3 Glovebox Control screen