Chromtech SuppierOperatingManuals - page 6

between manifold and mainframe
6. The system includes 4 stainless steel stretchable joint pipe for
connecting the canister. These pipes connect canister and manifold at
each end.
7. Humidifier: It has 2 1/8 inch outlets
which connect zero air
supply line and zero air entrance of mainframe. The humidifier
needs to be filled with super pure water at half level.
Check if canister body, inner parts and pump is damaged or join
pipe is filled with stuff. If everything remains fine
first remove
block of the pipe, then connect the pipe and wire. Mount the stand
before connecting the pipe
secondly connect pipe wire for air route as
required. Pipe wire must be firmly connected to ensure all the tie-ins
are air-proof (Note
Make sure there is no stuff in the pipe before
connecting pipe wires or it will spoil the pump). Then connect intake
pipe for zero air
and set pressure of zero air at about 35 psi through
regulator (it is recommended that air should be purified by purifier
before being filled to keep air clean) After connecting air route pipes
plug in 110VAC/220 VAC as instructed.
5. Basic operations
A. Introduction of touch screen operation menu
The system adopts touch screen for operation and control, it includes 4
screens as shown below
Screen 1 is main menu which contains 3
6
1,2,3,4,5 7,8,9,10,11,12,13,14,15,16-17,...269
Powered by FlippingBook