Chromtech SuppierOperatingManuals - page 5

Off-Delay Value all can be modified if really necessary
these can be
done in
Set
menu.
4. Instruction for Installation
The following preparations need to be done before installation
1. A working table or desk in 2.5 ~3 feet high and 5~6 feet long which
should be used to install mainframe and Manifold
2. Necessary tools for installation
3. 110 VAC/220V, 2KW Power for mainframe and 4 heating strip (if
heating oven used the power supplier for oven is required)
4. Super pure water
chromatogram level
);
5. Super zero air or high pure nitrogen, pressure over 35 psi.
Warning: helium is not allowed to use as it will damage the high
vacuum gauge.
Unpack the case: First check if case is damaged then unpack the case
to count if certain apparatus is missing. Full set of Nutech 2100A&B
Canister Cleaning kit includes:
1. Nutech 2100A or B Canister Cleaning mainframe
2. Manifold and stand;
3. Vacuum pump
4. 2 feet KF16 stainless stretchable joint pipe for connection
between vacuum pump and mainframe
5. 3 feet KF16 stainless steel stretchable joint pipe for connection
5
1,2,3,4 6,7,8,9,10,11,12,13,14,15,...269
Powered by FlippingBook