SRITN12 - page 199

Quick Start
GC Installation Guide
4. Insert thecolumnendwith thegraphiteferruleand
Swageloknutabouthalfwayintothemegaboreadapter
and tighten itwith thenutandferrule.
5. After inserting thecolumn into theadapter, insert thecolumnandadapter together into the injectionport.
Tighten theSwageloknutwitha
7/16”wrench. Youshouldfeela
littlegivefrom theferrule,butdo
notovertightenit.Youwantittight
enough toprvent leakage,butdo
notsmash theferrule.
6. Slideanother1/8”Swageloknut and
graphite ferruleover theotherendof the
column. ForaTCDdetector,connect the
nut to thefitting labeled“TCDIN” in the
columnoven.
ForanFIDdetector, leaveabout1”of thecolumn
protruding through thenutand ferrule. Insert the
column into theFIDbulkheadfitting in thecolumn
ovenwalland tighten theSwageloknut.
(“Column Installation”
continued
)
Connect thecolumn to theTCD IN tubing
Insert the column end into the FID
bulkhead fitting in thecolumnovenwall
Pleasesee“AnalyticalColumnInstallation” in the
INSTALLATIONsectionofyourmanualformore
detailedinformationoncolumninstallation.
Insert thecolumnandadapter into the injectionport
The column should
extendabouthalfway into
themegaboreadapter
1...,189,190,191,192,193,194,195,196,197,198 200,201,202,203,204,205,206,207,208,209,...505
Powered by FlippingBook