II. Column Installation
6. Thepressure thatcorrelateswith the flow rate for
thecolumn,make-upgases,anddetectorsupplies is
labeledon the right-hand sideof theGC. For best
EPCperformance, set the incominggaspressure(s)
15-20psihigher than theoperatingpressure listedon
theright-handsideof theGC.
1. IfyouorderedacolumnwithyourGC, it isshipped installed in thecolumnovenandyoucanskip this
section. Otherwise,open theGC lidand thecolumnoven lid.
(“Gas Installation&Connection”
continued
)
2. Theseinstructionswillcovertheinstallationofa0.53mmcapillary
columnintoanon-columninjector. TheSRIon-columninjectoris
designed fora26gaugesyringeneedle;a10µL liquid injection
syringewitha26gaugeneedle is included in theAccessoriesKit
shippedwithyourGC.
Amegabore adapter for syringe
injectiononto0.53mm capillary
columns is included in theSpare
PartsKitaffixedtotheinsideofthe
GC lid on the right-hand rear
corner.
Quick Start
GC Installation Guide
3. Themegaboreadapter isa1”x1/8”ODstainlesssteel tubewitha
perpendiculargashcut into it, andaconicalentry toguide thesyringe
needle into thecolumn. A0.53mmcapillarycolumnconnects to theSRI
on-column injectorwithagraphitereducingferruleanda1/8”Swagelok
nut. Insertoneendofthecolumnthroughthenut, thenthroughthegraphiteferrule. Itisagoodideatotrimoff
aboutoneinchofthecolumntoavoidpossiblepeaktailingfromanygraphiteshavingsleftbehindafterinserting
thecolumn through theferrule;makesure thecut isclean,withno jaggededges.
MegaboreAdapter
Accessories Kit
-OR-
Accessories Kit contents:
•
6’ Serial
or
USBcable
•
Tubingcutter
•
10µL liquid injectionsyringe
•
1mLgas injectionsyringe&needle
•
3mL leakchecksyringe
SparePartsKit