RecommendedSetup for Slurry-Packingof IKColumns
V-1
Assemble theColumnwith thePackingPortAdopter attached
to theBarrel.
Procure a pump capable of deliveringATLEAST~0.5CVper
minute.
Install tubing andValves as shown. For improvedprocess
control, usePressure gauge in a 0-30PSI (2 bar) range.
Tank#1: ensure that the intake tubing is SUBMERGED, e.g.
use a rigid rod.
Tank#2: inorder toprevent column drainingdry, SUBMERGE
both tubing tips or position themon the same level.
Pump
V-2