ESSENTIAL LIFE LC Columns - page 124-125

RecommendedSetup for Slurry-Packingof IKColumns
V-1
‰
Assemble theColumnwith thePackingPortAdopter attached
to theBarrel.
‰
Procure a pump capable of deliveringATLEAST~0.5CVper
minute.
‰
Install tubing andValves as shown. For improvedprocess
control, usePressure gauge in a 0-30PSI (2 bar) range.
‰
Tank#1: ensure that the intake tubing is SUBMERGED, e.g.
use a rigid rod.
‰
Tank#2: inorder toprevent column drainingdry, SUBMERGE
both tubing tips or position themon the same level.
Pump
V-2
1...,111,112,113,114,115,116,117,118-119,120-121,122-123 126-127,128-129,130,131,132,133,134,135,136,137,...171
Powered by FlippingBook