Page 122-123 - Upscale Column Manual.p65R2_0

Basic HTML Version

ASSEMBLAGE of IK COLUMNS
5.
Into the Lower Lid, install (3/8”-16) threaded studs using 2 hex nuts (A, B).
6.
Place the Barrel on the Lower Lid so that the Packing Port is located between the studs,
7.
Place the Upper Lid so that the Inlet ports are located at the opposite sides of the column perimeter, as shown.
8.
Tighten the lids together by holding wrenches on nuts A and C, working around the column perimeter and gradually increasing the
force.
9.
To open the column, hold the wrenches on nuts B and C.
A
B
C
Packing Port Plug
To replace the tip, use the tip from a 3-ml
BD-syringe if needed
Packing Port Adopter
Adopter connects to female Quick-
Disconnect® fitting for slurry packing.
Use replacement O-rings #011 (5/16 x 7/16)
and #110 O-ring: (3/8” x 9/16”), if needed.